Brummel
ef4eff3f8b
roadmap: ct.4 follow-ups (P2 check_in_workspace overlay narrow, P3 IR-shape test + lookup_ctor_in_pattern)
2026-05-11 10:13:13 +02:00
Brummel
a951c725be
roadmap: ct.1 follow-ups (CLI diag surface, dead KindMismatch, type_def_module re-key)
2026-05-11 01:52:33 +02:00
Brummel
8068be27a1
roadmap: P2 milestone — module-qualified class names + type-driven method dispatch
2026-05-11 00:36:15 +02:00
Brummel
2a98b31d84
iter architect-iron-law.3: JOURNAL entry + close roadmap todo
2026-05-10 20:03:21 +02:00
Brummel
1de300ed2c
fieldtest close: Floats — B1 fixed, F1+G1 documented, architect-checklist queued
2026-05-10 17:14:09 +02:00
Brummel
1ce2ff42dc
fieldtest follow-up: G1 (DESIGN.md NaN-print Unspecified) + F1 roadmap entry
2026-05-10 16:59:18 +02:00
Brummel
965e628c52
floats iter 5.4: roadmap — mark Floats [x] + unblock Post-22 Prelude
2026-05-10 16:38:45 +02:00
Brummel
406bde0efc
spec: floats milestone — Float as IEEE-754 binary64 primitive
2026-05-10 13:54:55 +02:00
Brummel
b523ceb18d
design-md-consolidation: audit close — JOURNAL entry + 3 follow-up items in roadmap (rustdoc sweep, architect-iron-law extension, drift-test fidelity widening)
2026-05-10 13:21:43 +02:00
Brummel
c6e433321e
design-md-consolidation 4: journal entry + milestone close + roadmap mark done
2026-05-10 13:14:51 +02:00
Brummel
af2064af6e
design-md-consolidation 3: journal entry + roadmap sweep-3 closed
2026-05-10 12:58:54 +02:00
Brummel
a5a101a010
design-md-consolidation 2: journal entry + roadmap sweep-2 closed
2026-05-10 12:37:21 +02:00
Brummel
7863f73b84
design-md-consolidation 1: journal entry + roadmap sweep-1 closed
2026-05-10 12:17:35 +02:00
Brummel
41c834008f
roadmap: drop per-task progress count from Sweep 1 entry
...
The "tasks 1-3 of 6 landed" snapshot ages out with every
sub-commit; the plan's own checkboxes are the live source.
Roadmap entry now just carries `[~]` + a pointer to the plan.
2026-05-10 11:51:48 +02:00
Brummel
ecc00fed8a
roadmap: introduce docs/roadmap.md as forward queue
...
Adds a priority-ordered, checkbox-format roadmap that the
orchestrator maintains. Three states (`[ ]` open / `[~]` in
progress / `[x]` done), four kinds (milestone / feature / todo /
idea), four priorities (P0..P3). Initial population lifts the
queued items from the JOURNAL tail.
JOURNAL's role narrows: chronological decisions log only, no
forward queue. CLAUDE.md "Roles of ..." section updated to
reflect the split.
2026-05-10 11:49:44 +02:00