Grounding-check PASS as the autonomous signature: 7 load-bearing
current-behaviour assumptions each ratified by a named green test;
greenfield surfaces (descriptor, loader, Aura.toml) excluded per
contract. Design decisions and provenance: the decision-log on the
milestone reference issue.
refs #180