c707250912
Grounding-check PASS as the autonomous signature: 8 load-bearing current-behaviour assumptions each ratified by a named green test (the templates are the cycle-0102 fixture verbatim, itself e2e-green); greenfield scaffolder surfaces excluded per contract. Fork decisions: the cycle-0103 reconciliation comment on the milestone reference issue. refs #180