a517899297
Follows the C10 rework (29cdc8c). C15: the deploy-grade geometry fields now defer
to the cost model's currency→R normalization / the live deploy edge, not the
retired Stage-2 realistic broker. Glossary: "realistic broker" and "Stage 1 /
Stage 2" marked superseded (kept as history); bias/broker/equity-stream/position-
table/R/R-metrics/R-evaluator/RiskExecutor/Sizer/sim-optimal-broker/veto reworked
to the cost-model-in-R model; added cost model, gross R, net R, net-R equity
curve, conviction-based risk allocation.