986a9fd5c7
Cycle 0066 (#133) closed. The close audit (architect) found the family ratified against C12 axis-2 (rank-by-metric over the C18 family store) and the C10 R framing, with one [high] gap (swept-member manifest omitted the fixed R-defining params) fixed forward in 499121e.
- Ledger: a C10 realization note records the durable rationale -- SQN as the single-number sweep objective, the signal-only grid (the stop defines R, so varying it breaks cross-member SQN comparability -- the SQN100 #130 motivation), the R-metric rank vocabulary, and the manifest-completeness fix.
- Glossary: new 'R metrics' and 'SQN' entries.
- The ephemeral spec + plan are removed; the ledger + git history are the durable record.
Follow-ups filed: #135 (per-member --trace for the stage1-r sweep). refs #133