docs(pipeline): single-source the milestone-close gate

Define the cycle/milestone distinction and the complete-and-functional
close gate once in pipeline.md; rename audit's cycle-close edge to
drift-clean so it no longer reads as a milestone close.
This commit is contained in:
2026-05-31 12:17:04 +02:00
parent 6723bd87dd
commit 4e38b0e0d0
+51 -2
View File
@@ -7,12 +7,12 @@
brainstorm -> plan -> implement debug -> implement (mini)
(per iteration loop)
|
[cycle close]
[cycle close — a loop step, not a milestone close]
|
v
audit --(drift)--> plan + implement (tidy iteration)
--(ratify)-> --update-baseline + ratify paragraph in audit commit body
--(clean)-+
--(drift-clean)-+
|
[orchestrator: cycle complete? if surface-touch:]
v
@@ -29,6 +29,55 @@
next cycle
```
## Cycle vs. milestone
These are two distinct axes, and conflating them is a bug.
- A **cycle** is one round in the pipeline graph above
(`brainstorm → planner → implement → audit → [fieldtest]`).
A cycle close is an internal loop step.
- A **milestone** is a tracker container (Gitea milestone,
GitHub milestone, Linear project — whatever the project's
tracker calls a long-running work scope). A milestone spans
potentially many cycles and closes only when the work it
promised is **complete and functional** (see the gate below).
`audit` runs at cycle close and proves *drift-clean* — the code
matches the design ledger. It is blind to whether the work is
*functional* from a downstream consumer's point of view; that is
what `fieldtest` measures. So no `audit` result closes a
milestone, and neither does a `/boss` done-state.
## Milestone-close gate
A milestone may be closed in the tracker only when **both** legs
hold:
1. **Complete** — every cycle filed under the milestone is
`audit` drift-clean (or its drift explicitly ratified), and
the milestone container has no open iterations / issues left.
2. **Functional** — the **milestone fieldtest** has run its
curated end-to-end scenarios against the milestone's promise
and its status roll-up is `clean`: every scenario
demonstrably delivers what the milestone promised; no open
`bug` findings; `friction` / `spec_gap` findings resolved or
ratified into the design ledger.
The milestone fieldtest is the milestone-wide variant of the
`fieldtest` skill: the same fieldtester agent, a carrier scoped
to the milestone's promise rather than one cycle's surface. Its
scenarios are chosen top-down from what the milestone as a whole
promised, not assembled as the union of per-cycle axes.
A milestone whose entire scope is internal (no user-visible
surface) is exempt from the functional leg — the milestone
fieldtest is *not applicable* and the complete leg suffices.
This gate defines *when* a milestone is closeable. The actual
close stays a deliberate human / orchestrator act (`tea
milestone close`, or the tracker equivalent); no skill performs
it automatically.