Brummel 77358d2240 chore: cycle 0054 close — per-instrument pip; C10/C15 realization note, retire spec+plan
Audit (architect drift review + cargo test --workspace) clean: code matches the
spec, the engine stayed domain-free (no instrument identity in Ctx / the hot
path), InstrumentSpec sits beside the hot path per C7/C15. No regression scripts
configured (no-op gate); the full suite is green.

Ratify: the architect flagged one ledger-realization gap — C10/C15 described
per-instrument pip as standing design intent but carried no realization note for
the now-shipped channel. Added dated realization notes to C10 (the per-instrument
pip channel + the refuse-don't-guess honesty rule) and C15 (instrument specs as
metadata, first realized by InstrumentSpec/instrument_spec).

Retire the ephemeral cycle artefacts (spec 0054, plan 0054) per the active-cycle
lifecycle. Deferred follow-up: #98 (route the runnable GER40 examples through the
lookup).

refs #22
2026-06-18 19:40:57 +02:00
S
Description
No description provided
18 MiB
Languages
Rust 68.9%
JavaScript 24.4%
HTML 6%
Shell 0.6%
CSS 0.1%