c406b969f5de535a2a294e73c4f1b45238539f2d
The 'R-based signal quality (Stage 1)' milestone is complete and ratified (iter-1/2/3 + the corrective primitives mini, the tiny-pip fix, the metric rename; end-to-end fieldtest green). Closing the cycle: - Milestone container + issues #119/#126/#127/#128/#129 closed on the tracker. - The ephemeral per-cycle spec (0065) and plans (0065-0069) are git-rm'd per the cycle-close convention; the durable rationale lives in the design ledger (the C10 cycle-0065 realization note) plus git history. Follow-ons tracked: #130 (n-normalized SQN), #131 (CLI UX), #132 (harness polish), #133 (R-sweep + rank-by-sqn), #134 (strategy-output param-namespace rename). refs #117
Description
No description provided
Languages
Rust
68.9%
JavaScript
24.4%
HTML
6%
Shell
0.6%
CSS
0.1%