Brummel c406b969f5 chore(stage1-r): finalize cycle 0065 — milestone closed, ephemeral spec/plans removed
The 'R-based signal quality (Stage 1)' milestone is complete and ratified
(iter-1/2/3 + the corrective primitives mini, the tiny-pip fix, the metric rename;
end-to-end fieldtest green). Closing the cycle:

- Milestone container + issues #119/#126/#127/#128/#129 closed on the tracker.
- The ephemeral per-cycle spec (0065) and plans (0065-0069) are git-rm'd per the
  cycle-close convention; the durable rationale lives in the design ledger (the C10
  cycle-0065 realization note) plus git history.

Follow-ons tracked: #130 (n-normalized SQN), #131 (CLI UX), #132 (harness polish),
#133 (R-sweep + rank-by-sqn), #134 (strategy-output param-namespace rename).

refs #117
2026-06-24 13:13:58 +02:00